ALFRED ENGELMANN DE MÉXICO



The complexity of this project consisted in merging their existing building with the new building which had working plastic molding injection machinery; part of the project included setting up a temporary airtight wall during stoppage time to prevent air pollution.

 

This was a complete engineering and construction of the industrial plan project, along with electric, hydro, plumbing work, office space, loading and unloading docks, roadways and parking.